Status: IN
Edge cluster lifecycle follows a managed pipeline: ZTP with GitOps provisions fleets at scale, TALM orchestrates updates with canary-first failure-gating, SNO provides the minimal topology, and vDU workloads require specific BIOS-level firmware constraints — creating an end-to-end edge operations model.
ZTP provisioning, TALM updates, SNO topology, and vDU constraints form a complete edge lifecycle
Depends on (SL): ztp-pattern-edge-fleet-management, talm-canary-failure-stops-update, sno-reduced-capability-profile, vdu-firmware-cstates-c0-c1-only